Most requests for quotation for crushing and mineral processing equipment state the material, the capacity and the product size. That is a good start, but it is not the whole picture. The same machine can need a different configuration depending on where it will run.
When site conditions are missing, the first quotation is usually a general one, and it has to be revised later. The notes below cover the conditions that most often change the equipment, so you can include them in the first message and get a more accurate quotation sooner.
1. Power supply
State the voltage and frequency available at site, and whether the supply is stable or comes from a generator. A weak supply or a long cable run affects how large motors are started, and whether a soft starter or a frequency drive is needed.
If power is limited, tell us the maximum connected load. It may change the number of machines running at the same time, or the choice between one large machine and two smaller ones.
2. Water
Say whether water is available at site, how much, and what quality. Water matters for sand washing, wet classification, flotation and leaching, and also for dust suppression. A plant designed for a wet process can be difficult to run in a dry location, and the reverse can also happen.
3. Dust, noise and environmental rules
Tell us if the site is close to housing, a river or a protected area, or if local rules limit dust and noise. These requirements can add dust collection, water spray, enclosed conveyors or covers, and sometimes change the layout.
4. Altitude and climate
Give the site altitude and the expected range of temperature and humidity, including the rainy season. High altitude affects motor rating and cooling. Heat, cold, humidity and heavy rain affect lubricants, hydraulic oil, electrical enclosures and corrosion protection.
5. Space and ground
Send the available area and, if you have it, a simple site sketch. Foundation conditions matter too, because heavy and vibrating equipment needs a suitable base. A tight site may call for a more compact layout, and a sloping site may allow gravity transfer between machines.
6. Access and transport
Check the road from the port to the site: width, weight limits, bridges and tunnels. Also check whether a crane is available for unloading and installation. These facts decide whether large machines can be shipped as one piece or need to be split into sections for transport.
7. People and spare parts
Tell us about your operating and maintenance team and how quickly spare parts can reach the site. A remote site with limited maintenance support usually benefits from simpler equipment and a larger stock of wear parts. For more on this, see Your Spare Parts List Is Part of the Plant Design.
Site conditions checklist for your RFQ
Copy this list into your enquiry and fill in what you know. Partial answers are fine.
- Material, capacity (t/h) and feed and product size
- Voltage, frequency and power stability
- Water availability and quality
- Dust, noise and environmental limits
- Altitude, temperature range and rainy season
- Available area and ground conditions
- Road access, crane availability and port
- Operator experience and spare parts delivery time
Final equipment selection should always be based on project-specific data and, where needed, detailed engineering review. For how we follow an order after it is placed, see Production and Quality.
Send us your site details: ore type, capacity, site conditions and location are enough to start. Request a quotation.