Small Scale Gold Processing Plant: How It Is Built

The first question we get from gold miners is almost always the same: “How much is a gold plant?” We can’t answer that in one line, and it’s not because we want to hide the price. A plant for 50 tonnes a day and a plant for 300 tonnes a day are different machines. A plant for free gold and a plant for gold locked in sulphides are different flowsheets.

So this note explains how a small plant is put together, and what we need to know from you before we can put numbers on it.

Check the ore first

Two ores can have the same gold grade and still need very different plants. If the gold is coarse and free, you can often get most of it with simple gravity recovery. If it sits inside sulphide minerals, you will probably need flotation. If it is very fine, leaching may be the way to go. You find out which one you have by testing a sample, and it’s much cheaper to do that before you buy equipment than after. We wrote more about this in Why the Same Gold Assay Can Need Two Different Plants.

Ball mill trunnion in the workshop
Ball mill trunnion in the workshop.
Flotation machine rotor
Flotation machine rotor.
Agitation tank impeller
Agitation tank impeller, used for leaching.

What is in the line

Most small plants follow the same order. What changes is the size of each machine, and what you put at the end.

StageWhat it doesWhat we can quote
FeedingPuts ore into the crusher at an even rateZSW vibrating feeder
CrushingBreaks big lumps down so the mill can take themPE jaw crusher, CJ European jaw crusher
ScreeningTakes out fine material, sends oversize backYK circular vibrating screen
GrindingFrees the gold from the rockMQG grate ball mill, MQY overflow ball mill
ClassificationSends coarse material back to the millSpiral classifier, FX hydrocyclone
RecoveryTakes the gold out of the ground oreSF flotation machine, leaching agitation tank

The mills and classifiers are on our Grinding and Classification page.

Three ways to recover the gold

Gravity. If your gold is coarse, gravity equipment can recover a good part of it before the ore goes anywhere else. Many plants put it at the front of a flotation or leaching circuit for this reason. If your ore needs it, tell us. We will check with the manufacturer what we can supply for your project.

Flotation. This works when the gold travels with sulphide minerals. You end up with a small amount of concentrate, which is then treated further or sold. In flotation, the grind size and the reagents usually matter more than which machine you buy.

Leaching with carbon (CIP or CIL). The ground ore is mixed with a leaching solution in agitation tanks, and the dissolved gold is picked up on activated carbon. In CIP the leaching and the carbon step are separate. In CIL they happen in the same tanks. You need a safe place for the tailings and the right permits for the reagents. Check what your country requires before you plan around this route.

For how a centrifugal concentrator and a shaking table work together in the gravity stage, see Gravity Gold Recovery in a Small Plant.

What moves the price

  • Tonnes per day. This sets the size of every machine in the line.
  • How hard the ore is, and how big the lumps are. Hard ore and big lumps mean a bigger crusher and more mill power.
  • The recovery route. A gravity-only plant, a flotation plant and a CIP plant are three very different jobs.
  • Power and water. Grid or generator, and how much water you can reuse.
  • Tailings and permits. Where the waste goes, and what the local rules say.
  • Spare parts and installation. Wear parts for the first year, and whether you want someone to help with commissioning. We wrote about spares in Your Spare Parts List Is Part of the Plant Design.

What to send us

  • Your ore type, and any assay or testwork results you already have
  • Tonnes per day, and how many hours a day you run
  • The largest lump in your feed, and the size you want after grinding
  • Power supply (grid or generator, voltage, frequency) and water available
  • Where the site is, its altitude, and how equipment can get there

Rough numbers are fine to start. If you are not sure what to include, the checklist in Site Conditions Buyers Often Forget to Mention in an RFQ is a good one to copy.

How we work

CNEIG INDUSTRIAL is the international business brand of Zhengzhou Jiamusheng Trading Co., Ltd. We are a trading and project-coordination company. We are not the factory. We agree the model and parameters with the manufacturer, put them in your quotation, and follow production and shipment for you. Before you pay the balance you can inspect the equipment. Our pre-shipment inspection checklist shows what to ask for.

Common questions

How much does a small gold processing plant cost?

It depends on your tonnage, your ore and the recovery route, so we don’t have one figure. Send us the details above and we will quote a configuration with a full equipment list.

Can you supply the whole line, or only single machines?

Either. We can quote crushing, screening, grinding, classification and recovery together, or only the machines you need to add to a plant you already have.

Do I need testwork before I buy?

We recommend it. It tells you which recovery route fits your ore, and it lowers the risk of buying machines that don’t suit the material. If you have no results yet, tell us and we will explain what sample to send for testing.

Planning a Gold Processing Plant?

Send your ore type, daily tonnage and site location. We will come back with a suggested configuration.

Send a Project Enquiry